(650) 592-7171

Services

Eight services. One principal on every job.

Commercial and industrial electrical work, from design-build to below grade. Search, or filter by system and project stage, and watch where each one sits in a building's power system.

Stage

8 of 8 shown

CKT 01Core focus

Power & distribution

Design / Build Electrical

One team owns the electrical design and the installation.

Palmer develops the electrical design around your building and program, coordinates it with the owner, architect and other trades, then installs it. It's the approach the company has always described: tailor the design and the installation to your needs, with attention at every stage of the project.

  • Design-build
  • Coordination
  • Switchboards & distribution
  • Design phase
  • New construction
CKT 02Core focus

Healthcare

OSHPD, Hospital Projects

Hospital and medical office work under California's healthcare plan review.

California hospitals are reviewed by HCAI, formerly OSHPD, with its own plan review, inspector of record and rules for the essential electrical system. Hospital and medical office building projects are where Palmer focuses most, for clients including Stanford Hospital and Clinics, Lucile Packard and Kaiser.

  • OSHPD / HCAI
  • Medical office buildings
  • Essential electrical systems
  • Design phase
  • New construction
  • Existing buildings
CKT 03Critical

Backup power

Generators

Standby generators, transfer switches and the feeders between them.

When utility power drops, a standby generator and automatic transfer switch bring the building's emergency and critical loads back on their own. We install the generator connections, the transfer switches and the distribution they feed, in new buildings and existing ones.

  • Standby power
  • Transfer switches
  • Emergency systems
  • New construction
  • Existing buildings
CKT 04Critical

Backup power

Uninterruptible Power Supplies

No-break power for servers, lab instruments and medical equipment.

A UPS carries sensitive equipment through a blip or the seconds before a generator picks up, so nothing reboots and no run is lost. We install the UPS, its maintenance bypass and the circuits it feeds.

  • UPS
  • Maintenance bypass
  • Critical circuits
  • New construction
  • Existing buildings
CKT 05Critical

Power & distribution

Power Quality / Load Monitoring

Measure what a building really draws before you add to it.

Metering and load studies show the actual demand on a service or panel: the numbers you need before adding equipment or sizing an upgrade. Power-quality logging also tracks down sags, harmonics and nuisance trips that hurt sensitive equipment.

  • Load studies
  • Metering
  • Troubleshooting
  • Existing buildings
CKT 06Critical

Life safety

Fire Alarm

Fire alarm panels, devices and wiring, installed to code.

Fire alarm control panels, detectors, pull stations, horns and strobes, and the wiring that ties them together, installed to code and ready for the fire marshal's acceptance test.

  • Life safety
  • Detection & notification
  • Acceptance testing
  • New construction
  • Existing buildings
CKT 07

Lighting

Lighting

Interior, exterior and controls, new or retrofit.

Lighting and lighting controls for new buildings, and retrofits for buildings already in use: fixtures, circuits, controls and the site lighting outside.

  • Interior & exterior
  • Controls
  • Retrofits
  • New construction
  • Existing buildings
CKT 08

Power & distribution

Underground

Below-grade conduit, duct banks and pull boxes.

Site electrical below grade: duct banks, conduit and pull boxes for utility services, feeders between buildings and site lighting.

  • Duct banks
  • Site work
  • Utility services
  • New construction

Scope doesn't fit a box?

Most projects touch several of these at once. Send the drawings and Palmer will price the whole electrical package.

Call office Request a bid
Concept by pxld · not affiliated with this business